Jones Power Expands Texas Solar Infrastructure with Peregrine Project

The Peregrine Solar Project is a 300-megawatt (MW) utility-scale solar farm under construction in Goliad County, Texas. Spanning 2,000 acres, this large-scale project is a key development in Texas’s growing renewable energy sector.

Who Is Leading the Construction?

Jones Power, a leading civil construction contractor, has been selected to oversee critical site development. The company has extensive experience, having completed over 60 utility-scale solar projects across 20 states.

What Does the Construction Work Involve?

Jones Power is responsible for:

  • Implementing Storm Water Pollution Prevention Plan (SWPPP) measures
  • Clearing and preparing the entire 2,000-acre site
  • Conducting site grading
  • Building access roads and laydown yards to facilitate future installation

Why Is This Project Important?

The Peregrine Solar Project will:

Read also Where to Buy Cement Steel & Bricks in the US

  • Expand Texas’s clean energy capacity, contributing to grid stability
  • Reduce reliance on fossil fuels, supporting the state’s renewable energy goals
  • Create local jobs, boosting the economy in Goliad County

How Does It Comply with the Inflation Reduction Act (IRA)?

Since the Inflation Reduction Act (IRA) introduced new compliance standards, Jones Power has worked with the U.S. Department of Labor to ensure the project meets federal guidelines for sustainable energy development.

When Will the Project Be Completed?

Construction is currently underway, with completion expected in late 2025.

The Peregrine Solar Project marks a significant step toward a cleaner energy future in Texas. With Jones Power at the helm, the project is set to enhance renewable energy infrastructure while adhering to the latest environmental and labor regulations.

Read also Bulldozer Cost in USA: Your Complete Guide to New & Used Prices

Leave a Comment